Slabs Drying Oven

Application:
The Slabs Drying Oven for granite slabs on a carrier was designed to reduce the slabs drying time from 2 or 3 days to 6 hours, allowing the humid slabs that came from levigation, polishing, or processing to be resined on the same day, reducing the production time, available storage space, and improving internal logistics.

     

 

Description

Slabs Drying Oven
Comparative chart between models:

Image gallery

Videos

You may also like…

en_US